| S.No | Work Description | Amount Sanctioned | Name of Exau |
| 1 | LAYING OF 300MM DIA & 200MM DIA SWG SEWER LINE FROM H.NO.12-11-529 TO 12-11-534 12-11-532 TO 12-11-771 ADN 12-11-629 /96 TO 12-11-629/252 AT L.NARAYANA NAGAR UNDER SRINIVAS NAGAR | 536731 | MDHMWSSB |
| 2 | LAYING OF 300MM DIA SWG SEWER LINE FROM GOOD WILL HOTEL TO H.NO.12-10-590/129/4 AT WARASIGUDA SEETHPHALMANDI SECUNDER IN SEC'BAD CONSTITUENCY | 326254 | MDHMWSSB |
| 3 | LAYING OF 200MM DIA SWG SEWER LINE FROM H.NO.1-2-217/15 TO 1-2-217/2 AT DOMALGUDA UNDER MUSHEERABAD ASSEMBLY SEGMETN | 160000 | MDHMWSSB |
| 4 | LAYING OF 100MM DAI WATER SUPPLY LINE AT RAMA KRISHNA NAGAR NEAR GRAVE YEARD UNDER ADIKMET | 90000 | MDHMWSSB |
| 5 | LAYING OF 100MM DIA WATER SUPPLY LINE FROM .NO.2-2-185/24/40 TO 2-2-185/24/46 AT MALLIKARJUNA NAGAR (HANUMAN TEMPLE) UNDER ADIKMET SECTION | 68238 | MDHMWSSB |
| 6 | LAYING OF 300MM DIA SWG SEWER LINE FROM AMBERPET MAIN ROAD TODDY SHOP TO 2-2-70 AT RAMANTHAPUR MAIN ROAD UNER ADIKMET SECTION | 329293 | MDHMWSSB |
| 7 | LAYING OF 250MM DIA SWG SEWERE LINE FROM H.NO.2-3-50/B TO 2-3-43 QADRI BAGH AREA UNDER GOLNAKA SECTION | 351587 | MDHMWSSB |
| 8 | LAYING OF 250MM DIA SWG SEWER LINE MAIN AT H.NO.1-1-2/A 10102/G TELEPHONE EXCHANGE LANEUNDER GANDHI NAGAR SECTION | 322589 | MDHMWSSB |
| 9 | LAYING OF 200MM DIA SWG SEWER LINE FROM H.NO.6-6-161 TO 6-6-181 AD H.NO. 6-6-37/17 TO 6-6-145 ON KAWADIGUDA MAIN ROAD IN PLACE OF 150MM DIA SEWER PIPE LINE UNDER BOATS CLUB SECTION | 418243 | MDHMWSSB |
| 10 | LAYING OF 250MM DIA SWG SEWER LINE FROM H.NO.1-4-880/29 TO 1-4-961 K.K PATEL GALLY & LAYING OF 200MM DIA SWG SEWERLINE FROM H.O.1-4-941/98 TO 1-4-950/1/9/1 KRUPA RAO GALLY BHOLAPUR | 753069 | MDHMWSSB |
| 11 | LAYING OF 200MM DIA SWG SEWER LINE IN PLACE OF DAMAGED 150 MM DIA SWG SEWER LINE FOR H.NO1-6-227/22 TO 1-6-247/19/6 IN PRINCE COLONY UNDER MUSHEERABAD SECTION | 185131 | MDHMWSSB |
| 12 | "LAYING OF 4"" DIA DI WATER SUPPLY LINE FROM H.NO.1-1-6-374 TO 1-6-427 IN FISH MARKET AREA MUSHEERABAD SECTION" | 109592 | MDHMWSSB |
| 13 | REPLACEMENT OF 150MM DIA SWG SEWER LINE TO 300MM DIA SWG SEWER LINE FROM H.NO.1-9-18/A/1 TO 1-7-941/1 AT RAMNAGAR UNDER VIDYANAGAR SECTION | 563649 | MDHMWSSB |
| 14 | LAYING OF 200MM DIA SWG SEWER LINE IN PLACE OF EXISTING (DAMAGED) 150MM DIA SWG SEWER LINE FROM H.NO.1-9-649 TO SRT COMMUNITY HALL AND SRT 69 TO SRT 27 SRT QTRS. UNDER VIDYANAGAR S | 495042 | MDHMWSSB |
| 15 | CONSTRUCTION OF BATH ROOM PROVIDING FO CC APPROACH RAOD AND SHELTER IN HINDU SMASHANA VATIKA BESIDE SATYA SAI SCHOOL AT BAGH AMBERPET | 495063 | COMMISSIONER GHMC |
| 16 | CONSTRUCTION OF COMMUNITY HALL IN INDIRA REDDY ALLWYN COLONY MIYAPUR (VP SELILINGAMPALLY (M & MUNICIPALITY )R.R. DIST. | 600000 | COLLECTOR RR DIST |
| 17 | LAYING OF INTERNAL ROADS NEAR THE RESIDENTAIL QUARTERS CONSTRUCTED DURING 1983 IN THE 8TH BN. APSP KONDAPUR | 600000 | COLLECTOR RR DIST |
| 18 | LAYING OF 160MM DIA AND 110 MM DIA HDPE WATER SUPPLY PIPE LINE AT GREEN FIELDS COLONY KANAJIGUDA ALWAL KHAIRATABAD ASSEMBLY SEGMET | 150000 | COLLECTOR RR DIST |
| 19 | ERECTION OF 18NOS FT's (2x40 W) ON 25 POLES AT PALAMOR PRJALA SANKSHEMA SANGH WEAKER SECTION GREEN FIELDS KANAJIGUDA ALWAL KHAIRATABAD ASSEMBLY SEGMENT | 150000 | COLLECTOR RR DIST |
| 20 | CONSTRUCTION OF COMPOUND WALL AT HINDU GRAVE YARD PAMULA BASTHI AMBERPET HIMAYATNAGAR ASSEMBLY SEGMENT | 67000 | COMMISSIONER GHMC |
| 21 | CONSTRUCTION OF PROTECTION WALL ALONG THE MUSI RIVER AT CHUDI BAZAR SLUM AREA DHOOLPET IN WARD NO.14 DIVISION NO.II MAHARAJGUNJ ASSEMBLY SEGMENT | 2500000 | E.E. HUSAIN SAGAR LAKE HYD |
| 22 | LAYING OF 200MM DIA SWG PIPE LINE FROM H.NO. 8-3-228/578/29/1 TO HNO. 8-3-228/581/38 AT SANTOSHIGIRI RAHMAHNAGAR UNDER VENGAL RAO NAGAR SECTION UNDER KHAIRATABAD ASSEMBLY SEGMETN | 147458 | MDHMWSSB |
| 23 | LAYING OF 200MM DIA SWG PIPE LINE FROM H.NO. 8-3-228/29/1 TO H.NO. 8-3-228/581/30/5 ADN FROM 8-3-228/581/29/C AT SANTOSHIGIRI TEMPLE ARA AT RAHMATHNAGAR UNDER VENGAL RAO NAGAR SECT | 185709 | MDHMWSSB |
| 24 | LAYING OF 150MM AND 100MM DIA WATER SUPPLY LINE FROM H.NO. 8-3-587/4 AT SANTOSHGIRI TEMPLEAT RAHMAT NAGAR V.R NAGAR SECTION UNDER KHAIRATABAD ASSEMBLY SEGMENT | 677711 | MDHMWSSB |
| 25 | LAYING OF 200/150/100 MM DIA D1 DWS LINE FROM H.NO. 12-11-455 TO 477 H.NO. 12-11-539 TO 291 AND H.NO. 12-11-34/4 TO197/D/3 AT WARASIGUDA UNDER SRINIVASNAGAR SECTION OF SECUNDERABA | 1000000 | MDHMWSSB |
| 26 | LAYING OF HDPE LINES WATER SUPPLY LINE AT SURYA NAGAR (EAST) OLD ALWAL IN ALWAL MUNICIPALITY UNDER KHAIRATABAD ASSEMBLY SEGMENT RR DISTRICT | 500000 | COLLECTOR RR DIST |
| 27 | LAYING OF 200MM DIA SEWERAGE LINES AT INDIRA NAGAR AND MEDI BAVI UNDER SEETHPHALMANDI SECTION OF SECUNDERABAD ASSEMBLY CONSTITUENCY | 613106 | MDHMWSSB |
| 28 | LAYING OF 150/100 MM DIA DIA FEEDER AND DISTRIBUTION LINES FOR PROVIDING WATER SUPPLY TO VASANTHA ESTATES AT GUTTALABEGUMPET UNDER MADHAPUR SECTION RR DISTRICT | 948000 | COLLECTOR RR DIST |
| 29 | LAYING OF 90MM DIA HDPE AND 150MM DIA SWG PIPE LINE AT WEST BHAVANI NAGAR W.NO.21 IN ALWAL MUNICIPALITY RR DISTRICT | 175000 | COLLECTOR RR DIST |
| 30 | LAYING OF RCC PIPE FROM 5-764 TO 5-675 AT AT WEST BHAVANI NAGAR MAIN ROAD OLD ALWAL W.NO.21 IN ALWAL MUNICIPALITYR R DISTIRCT | 145000 | COLLECTOR RR DIST |
| 31 | CONSTRUCTION OF HALL AT AMBERPET GRAVE YARD UNDER BAGH AMBERPET DIVISION WARD NO.II IN HIMAYATNAGAR ASSEMBLY SEGMENT | 465000 | COMMISSIONER GHMC |
| 32 | PURCHSE OF NEW MARUTI OMNI AMBULANCE FOR SECRETARIAT DISPENSARY AT SECRETARIAT HYDERABAD | 278983 | MEDICAL OFFICER DISP. SECT. |
| 33 | MEDICAL EQUIPMENT (SIX ITEMS) TO AMBULANCE FOR SECRETARIAT DISPENSATY AT SECRETARIAT HYDERABDA | 39670 | MEDICAL OFFICER DISP. SECT. |
| 34 | LAYING OF METAL ROADS AT PRUDENTIAL BANK COLONY WARD NO.10 IN ALWAL MUNICIPALITY UNDER KHAIRATABAD ASSEMBLY SEGMENT R.R DISTRICT | 450000 | COLLECTOR RR DIST |
| 35 | LAYING OF 150MM AND 100MM DIA DI WATTER SUPPLY PIPELINES FROM NEW RAMALAYAM TEMPLE ON DAYARA MARKET MAIN ROAD TO 1-7-572/3/1 CHANDRA COMPLEX AND FOR BY LANES UNDER AZAMABAD SECTIO | 414998 | MDHMWSSB |
| 36 | lAYING OF 150MM AND 100MM DIA DI WATER SUPPLYPIPELINES FROM H.NO.1-7-517/1/4/A TO SHIVA TEMPLE AND FROM H.NO.1-7-513/1/1 TO H.NO.1-7-513/1/15 IN PAVITHRA NAGAR UNDER AZAMABAD SECT | 495662 | MDHMWSSB |
| 37 | LAYING OF 100 MM DIA DI WATER SUPPLY LINE FROM H.NO.1-7-500 (WHITE HOUSE ) TO H.NO.1-7-513/D/1 IN HARI NAGAR UNDER AZAMABAD SECTION | 201044 | MDHMWSSB |
| 38 | SHIFTING 11 K.V HIGH TENSION WIRE PASSINGOVERTHE RESIDENTIAL HOUSES AT N.R.R PURAM COLONY SITE I BORABANDA ERRAGADDA UNDER KHAIRATHABAD ASSEMBLY SEGMENT | 115006 | APCPDCL |
| 39 | "LAYING OF 200 MM (8"") DIA SEWER LINES AT H.NO.6-5-485 TO 6-5-423 AND FROM 6-5-43 TO 6-5-502 UNDER BHOGUDA SECTION" | 510000 | MDHMWSSB |
| 40 | "LAYING OF 200 MM(8"") DIA SEWER LINES AT H.NO.6-5-545 TO 6-5-498 AND FROM 6-5-502 TO 6-5-375 NEW BHOIGUDA UNDER BHOIGUDA SECTION" | 465000 | MDHMWSSB |
| 41 | "CONSTRUCTION OF COMPOUND WALL BATH ROOMS ERECTION OF GATE AD DRILLING OF 6 1/2"" DIA BOREWELL AT BAGH AMBERPET NEAR MUSI RIVER BRIDGE OF HIMAYATNAGAR ASSEMBLY SEGMENT" | 345545 | COMMISSIONER GHMC |
| 42 | COMPUTER EDUCATION PROJECT AT GOVT. HIGH SCHOOL GANDHIBHAVAN NAMPALLY HYDERABAD | 484110 | M/S CREATIVE COMPUTER TECH. |
| 43 | TSUNAMI REHABILITATION WPRLS PF THE TSUNAMI AFFECTED AREAS | 500000 | COLLECTOR PRAKASAM |
| 44 | MEDICAL EQUIPMENT TO GANDHI HOSPITAL | 1323392 | SUPDT. GANDHI SECUNDERABAD |
| 45 | lLAYING OF METAL ROAD AT TELCOME EMPLOYEES COLONY ALWAL MUNICIPALITY RR DISTRICT | 600000 | COLLECTOR RR DIST |
| 46 | PROVIDING OF AMBULANCE TO THE IRSDSAINIKPURI SECUNDERBAD. RR DISTRICT | 300000 | COLLECTOR RR DIST |
| 47 | LAYING OF 250MM SWG SEWER LINE FROM MAHANKALI TEMPLE H.NO.1-6-71/A AND 1-6-95/1 TO 1-6-1052 AT MUSHEERABAD UNDER SDII SECTION OM DN-V. | 743664 | MDHMWSSB |
| 48 | LAYING OF 200 MM DIA SEWER LINE FROM H.NO.1-6-1055/1 TO 1-6-19 AND FROM 1-6-1043 TO 1-6-1049 AT MUSHEERABAD UNDER MUSHEERABAD SCTION OF SDII OM DN.V | 386453 | MDHMWSSB |
| 49 | LAYING OF 300 MM DIA D.I. WATER SUPPLY FEEDER MAIN FROM OPP H.NO.1-7-1046/49 RAM NAGAR MAIN ROAD TO H.NO.1-9-8/1 MEDI BAVI UNDER VIDYANAGAR SECTION. | 1200000 | MDHMWSSB |
| 50 | LAYING OF 200MM DIA SEWER LINES NEAR UPPALAMMA TEMPLE BHOIGUDA SECTION | 404110 | MDHMWSSB |
| 51 | LAYING OF 200MM DIA SEWER LINE IN JAIN NAGAR COLONY AND AMMUGUDA HUTS UNDER BHOIGUDA SECTION | 669926 | MDHMWSSB |
| 52 | LAYING OF 200 MM DIA SEWER LINE IN BHOLAK PUR IDH COLONY GANDAMMA TEMPLE UNDER BHOIGUDA SECTION | 506939 | MDHMWSSB |
| 53 | CONSTRUCTION OF HALL IN DEVNIKUNTA HINDU SHAMSHANA VATIKA IN WARD NO-10 DIV-7 MCH | 467555 | COMMISSIONER GHMC |
| 54 | CONSTRUCTION OF BOTH ROOMS FOR LADIES AND GENTS AND DRILLING OF 6 DIA BOREWELL WITH PUMP SET IN DEVNIKUNTA HINDU SHAMSHANA VATIKA IN WARD NO-10 DIV-7 MCH | 716081 | COMMISSIONER GHMC |
| 55 | CONSTRUCTION OF STORE ROOM IN DEVNIKUNTA HINDU SHAMSHANA VATIKA IN WARD NO-10 DIV-7 MCH. | 177175 | COMMISSIONER GHMC |
| 56 | CONSTRUCTION OF CREMATION SHELTER AT DEVNIKUNTA HINDU SHAMSHANA VATIKA IN WARD NO-10 DIV-7 MCH | 394698 | COMMISSIONER GHMC |
| 57 | LAYING OF 150MM DIA/100MM DI K7 CLASS PIPE LINE IN BHOLAKPUR AREA FROM H.NO.6-4-369/18 TO 6-4-369/12 AND H.NO.6-4-460 TO 6-456/6/8 I | 740072 | MDHMWSSB |
| 58 | LAYING OF 200MM DIA SWG SEWER PIPE LINE AT GOSHAMAHAL ROAD FROM H.NO.5-5-514 TO H.NO.5-5-529 UNDER HINDI NAGAR SECTION SUB.NO.IV O&M DN.NO.IV AT MALAKUNTA ROAD UNDER HINDI NAGAR | 116366 | MDHMWSSB |
| 59 | LAYING OF CC ROAD FROM 2-4-255/7 TO MAIN ROAD FROM TEMPLE TO WARD OFFICE IN NEHRU NAGAR KACHIGUDA HIMAYATNAGAR ASSEMBLY SEGMENT HYDERABAD | 576749 | COMMISSIONER GHMC |
| 60 | LAYING OF SWG PIPELINE AT LAXMI NAGAR 7 CC ROAD AT LOTHUKUNTA W.NO.8 UNDER KHAIRTABAD ASSEMBLY SEGMENT | 200000 | COLLECTOR RR DIST |
| 61 | LAYING OF CC ROAD AT VIKAS COLONY GOLLAGUDA W.NO.9 UNDER KHAIRATABAD ASSEMBLY SEGMENT | 200000 | COLLECTOR RR DIST |
| 62 | LAYING OF CC ROAD SWG PIPELINE AND HDPE PIPE LINE FROM H.NO.1-4-129 TO 1-4-127 AND 1-4-127/1 KUMMARI BASTHI OLD ALWAL WARD NO.22 UNDER KHAIRATABAD ASSEMBLY SEGMENT | 380000 | COLLECTOR RR DIST |
| 63 | LAYING OF BT ROAD FROM H.NO.20-53 TO H.NO.20-49 AT VENKATAPURAM W.NO. 14 UNDER KHAIRATABAD ASSEMBLY SEGMENT | 300000 | COLLECTOR RR DIST |
| 64 | LAYING OF CC ROAD FROM H.NO.31-630 TO B.T. ROAD AT RAJEEV GANDHI NAGAR W.NO.11 UNDER KHAIRATABAD ASSEMBLY SEGMENT | 100000 | COLLECTOR RR DIST |
| 65 | LAYING OF CC ROAD AT RAJEEVE GANDHI NAGAR WARD NO.11 UNDER KHAIRATABAD ASSEMBLY SEGMENT | 200000 | COLLECTOR RR DIST |
| 66 | LAYING OF CC ROAD AT TEMPLE ALWAL W.NO.6 UNDER KHAIRATABAD ASSEMBLY SEGMENT | 200000 | COLLECTOR RR DIST |
| 67 | LAYING OF CC ROAD FROM TRANSFORMER TO SCHOOL CULVERT AT TEMPLE ALWAL W.NO.6 UNDER KHAIRATABAD ASSEMBLY SEGMENT | 100000 | COLLECTOR RR DIST |
| 68 | RESTRATION OF THOPU VANKA SUPPLY CHANNEL TO PROTECT SC ST LANDS NEAR KONAIAH GARIPALLE VILLAGE IN PULLAMPET MANDAL OF KADAPA DISTRICT | 250000 | COLLECTOR CUDDAPAH |
| 69 | PROVIDING PROTECTION ARRANGEMENTS TO THE COSTLY GARDEN LANDS ALONG PULLARIGERU RIVER NEAR DEGALAVANDLAPALLE VILLAGE IN PULLAMPET MANDAL OF KADAPA DISTRICT | 300000 | COLLECTOR CUDDAPAH |
| 70 | PROVIDING PROTECTION ARRANGEMENTS TO THE COSTLY GARDEN LANDS ALONG PULLANGERU RIVER NEAR RAMPVARI VILLAGE AND ANANTHAIAHGARIPALLE VILLAGE OF PULLAMPET MANDAL OF KADAPA DISTRICT | 300000 | COLLECTOR CUDDAPAH |
| 71 | PROVIDING PROTECTION ARRANGEMENTS TO THE COSTLY GARDEN LANDS ALONG GUNDERU ON THE DOWN STREAM SIDE OF BOMMAVARAM VILLAGE IN OBULAVARIPALLE MANDAL OF KADAPA DISTRICT | 150000 | COLLECTOR CUDDAPAH |
| 72 | PROVIDING BASIC AMENITIES INCLUDING BORE WELL SYNTAX TANK PROTECTION WALL HY-MAST LIGHTS ETC IN GRAVE YARD AT RISALA KHURSHEED JAHI RAM NAGAR DIVISION OF MUSHEERABAD ASSEMBLY S | 895711 | COMMISSIONER GHMC |
| 73 | LAYING OF 150MM DIA SEWER AND 100MM DIA DI PIPELINE FROM H.NO.6-3-330 TO 6-3-3179/22 AND H.NO.6-3-97 TO 6-3-166 AT JAINAGAR UNDER BHOIGUDA SECTION SEC'BAD ASSEMBLY SEGMENT. | 809564 | MDHMWSSB |
| 74 | DRILLING OF 6 DIA POWER BORE WELL AND PROVISION OF A STATIC TANK AT KHADRIBAGH GRAVE YARD FALLING UNDER RAMANTHAPUR SECTION MUSHEERABAD ASSEMBLY SEGMENT | 221500 | MDHMWSSB |
| 75 | LAYING OF 200 MM DIA SWG SEWER LINE FROM RAILWAY TRACK LALAGUDA TO H.NO.10-5-342/49 AND BAPTIST CHURCH TO 10-5-342/1 AT LALAGUDA UNDER METTUGUDA SECTION. | 738427 | MDHMWSSB |
| 76 | LAYING OF REPLACEMENT OF 150 MM DIA SWG SEWER LINE WITH 250MM & 200MM DIA SWG SEWER LINE FROM H.NO.10-5-342/38 TO 10-5-79/6/A AT KONDAREDDYNAGAR TUKARAMGATE UNDER METTUGUDA SECTIO | 772480 | MDHMWSSB |
| 77 | LAYING OF 200MM DIA SWG SEWER LINE FROM 2-2-1144/3/2 TO 2-2-1136/2/B (4LANES) AT NEW NALLAKUNTA UNDER SHIVAM SECTION | 579581 | MDHMWSSB |
| 78 | LAYING OF 200 MM DIA & 250 MM DAI SWG PIPELINE AT SAI NAGAR COLONY PHASE I KHANAJIGUDA AT WARD NO. 11 ALWAL MUNICIPALITY RANGAREDDY DISTRICT | 545000 | COLLECTOR RR DIST |
| 79 | LAYING OF CC ROAD FROM 1-111/17 TO 1-111/1/2 ANANDNAGAR KONDAPUR AND AT SUMAJJALI SCHOOL ANANDNAGAR OF KHAIRATHABAD ASSEBMBLY SEGMENT. | 1000000 | COLLECTOR RR DIST |
| 80 | CONSTRUCTION OF COMMUNITY HALL (GROUND & FIRST FLOORS) AT TATACHARY COLONY NEAR SRI DURGA DEVI POCHAMMA TEMPLE BEGUMPET IN SANATHNAGAR ASSEMBLY SEGMENT | 780000 | COLLECTOR RR DIST |
| 81 | CONSTRUCTON OF COMMUNITY HALL AMBEDKAR WELFARE ASSOCIATION ALLAMTHOTA BAVI BEMUMPET IN SANATHNAGAR ASSEMBLY SEGMENT. | 570000 | COLLECTOR RR DIST |
| 82 | LAYING INTERNAL ROADS IN 8TH BN. APSP KONDAPUR RR DIST. | 500000 | COLLECTOR RR DIST |
| 83 | CONSTRUCTION OF MASTAN NAGAR GOVERNMENT PRIMARY SCHOOL BUILDING SREILINGAMPALLY RANGAREDDY DISTRICT. | 740000 | COLLECTOR RR DIST |
| 84 | CONSTRUCTION DHOBHIGHAT SHAIKPET | 235000 | EE (SW) HYDERABAD |
| 85 | PROVIDING GRILL OVER OPEN WELL AT CHILKALGUDA DHOBIGHAT | 48728 | EE (SW) HYDERABAD |
| 86 | CONSTRUCTION OF SHED AND TOILET AT MAREREDPALLY | 327611 | EE (SW) HYDERABAD |
| 87 | BOREWELL AT GOSADAN NAGAR TANK BUND PHASE II | 125000 | EE (SW) HYDERABAD |
| 88 | CONSTRUCTIO OF SHED AT PATIGADDA DHOBHI GHAT | 155286 | EE (SW) HYDERABAD |
| 89 | CONSTRUCTION OF COMPOUND WALL AT KUKKALATHOMU | 234356 | EE (SW) HYDERABAD |
| 90 | CONSTRUCTION OF SHED OVER KHANAS AND TOILETS AT THAGGI JAIL | 490824 | EE (SW) HYDERABAD |
| 91 | CONSTRUCTION OF CLASS ROOMS AND LABS IN THE GOVERNMENT PRIYADARSHINI COLLEGE FOR WOMEN AT NAMPALLY HYDERABAD | 997530 | EE (SW) HYDERABAD |
| 92 | "DRILLING OF 61/2"" DIA BORE WELL WITH SUPPLY AND FIXING SUBMERSIBLE PUMP SET AT H.NO. 465 NEAR COMMUNITY HALL IN SECUNDERABAD" | 134000 | EE (SW) HYDERABAD |
| 93 | "DRILLING OF 61/2"" DIA POWER BOREWELL SUPPLY DELIVERY AND ERECTION OF POWER MOTOR AND CONSTRUCTION OF BRICK MASONARY PADASTALS WITH SYNTAX OF 2500 LTRS. CAPACITY EACH ALONG WITH GI" | 211505 | MDHMWSSB |
| 94 | "DRILLING OF 61/2"" BOREWELL SUPPLY DELIVERY AND ERECTION OF POWER MOTOR AND CONSTRUCTION OF BRICK MASONARY PEDASTALS WITH SYNTAX OF 2500 LTRS. CAPACITY EACH ALONG WITH GI FITTINGS" | 226466 | MDHMWSSB |
| 95 | "DRILLING OF 6"" POWER BORE WELL AT GPS SANGAM FISH MARKET" | 200000 | MDHMWSSB |
| 96 | "DRILLING OF 6"" POWER BORE WELL AT MUSHEERABAD PLAY GROUND" | 200000 | MDHMWSSB |
| 97 | "DRILLING OF 6"" POWER BORE WELL AT RADIANT SCHOOL BHARATH NAGAR" | 200000 | MDHMWSSB |
| 98 | "DRILLING OF 6"" POWER BORE WELL AT PATTAN BASTHI" | 200000 | MDHMWSSB |
| 99 | "DRILLING OF 6"" POWER BORE WELL AT PARSIGUTTA BURIAL (MUDHIRAJ)" | 200000 | MDHMWSSB |
| 100 | LAYNG OF 200 GWG SEWER LINE FROM H.NO. 3-5-786/21 TO 3-5-784/47 AT SHERGATE KING KOTI | 263269 | MDHMWSSB |
| 101 | LAYING OF 200 DIA SEWER LINE FROM H.NO. 3-5-782/10/4 TO 3-5-782/52/A AND TO 3-5-782/8/A BAKERY SHERGATE | 91421 | MDHMWSSB |
| 102 | LAYING OF 150/100 MM DI WATER SUPPLY DISTRIBUTIO AND FEEDER MAIN AT HEMAVATHI NAGAR UNDER ERRAGADDA SECTION HYDERABAD. | 929132 | MDHMWSSB |
| 103 | LAYING 200 MM SWG LINE IN PLACE OF EXISTING (DAMAGED) 150 MM DIA OPP. BALKAMPET GRAVE YARD IN FATHENAGAR SECTION. | 408715 | MDHMWSSB |
| 104 | LAYING 100 MM DIA di WATER SUPPLY LINE IN PLACE OF OLD RCC PIPELINE OPP. TO BALKAMPET GRAVEYARD UNDER FATHENAGAR SECTION | 250000 | MDHMWSSB |
| 105 | LAYING CC ROAD INSIDE THE GRAVE YARD AND AROUND BURNING PLAT FORMS OF BALKAMPET GRAVE YARD NEAR ROB BALKAMPET IN DIVISION NO. 9 MCH. | 657086 | COMMISSIONER GHMC |
| 106 | LAYING CC ROAD INSIDE THE GRAVE YARD AND AROUND BURNING PLATFORMS WAITING HALLS AND CONSTRUCTION OF TOILETS OF GRAVEYARD AT BJR NAGAR SLUM-II NEAR RAILWAY TRACK BALKAMPET DIVIS | 1149207 | COMMISSIONER GHMC |
| 107 | CONSTRUCTION OF BURNING PLATFORM SHED BATHROOMS WASHING PLATFORMS AND WATER SUPPLY INSIDE THE DHANIYALAGUTTA GRAVE YEAR BEGUMPET DIVISION NO. 11 MCH | 757001 | COMMISSIONER GHMC |
| 108 | LAYING OF 300 MM DIA SEWER LINE FROM H.NO. 2-3-603/49/67/2 TO 2-3-603/50/A/38 NEW PATEL NAGAR UNDER RAMANTHAPUR SECTION | 586320 | MDHMWSSB |
| 109 | LAYING OF DAMAGED 200 MM DIA SWG LINE FROM H.NO. 2-3-703/2/B/1/29/4 TO 2-3-703/2/B/1/3435 MARUTHI NAGAR UNDER RAMANTHAPUR SECTION | 348184 | MDHMWSSB |
| 110 | LAYING OF 300 MM DIA SWG LINE FROM H.NO. 1-5-3/8 TO 1-5-6/19 AND LAYING OF 200 MM DIA SWG LINE FROM 1-5-/1 TO 1-5-6/4 AT KRISHNA NAGAR COLONEY AT BAKARAM UNDER MUSHEERABAD SECTION | 587928 | MDHMWSSB |
| 111 | "LAYING OF 300 MM DIA SWG LINE FROM MUSHEERBAD X ROADS TO H.NO. 1-6-5 AN LAYING OF 8"" DIA SWG LINE FROM H.NO. 1-6-699 TO 1-6-929 AT MUSHEERABAD SECTION." | 617633 | MDHMWSSB |
| 112 | LAYING OF 100MM DIA DI WATER MAIN LINE FROM H.NO.6-3-1177/7/4 TO 6-3-1177/7 HUSSAIN NAGAR B.S. MAQTHA UNDER SOMAJIGUDA SECTION | 219478 | MDHMWSSB |
| 113 | LAYING OF 100MM DIA DI WATER MAIN LINE FROM H.NO.6-3-1177/A/22 TO 6-3-1177/A/12 HUSSAIN NAGAR B.S. MAQTHA UNDER SOMAJIGUDA SECTION | 215581 | MDHMWSSB |
| 114 | LAYING OF 200MM DIA SEWERAGE LINE FROM H.NO.6-3-1177/3 TO 6-3-1177/4 HUSSAIN NAGAR B.S. MAQTHA UNDER SOMAJIGUDA SECTION | 171040 | MDHMWSSB |
| 115 | LAYING OF 200MM DIA SEWERAGE LINE FROM H.NO.6-3-1177/A/22 TO 6-3-1177/A/12 HUSSAIN NAGAR B.S. MAQTHA UNDER SOMAJIGUDA SECTION | 150133 | MDHMWSSB |
| 116 | LAYING OF 200 MM DIA SWG LINE FROM H.NO.3-5-782/K/2/7 TO 3-5-782/1 AT PARDAGATE KINGKOTHI UNDER NARAYANAGUDA SECTION | 122503 | MDHMWSSB |
| 117 | LAYING OF 200 MM DIA SWG LINE FROM H.NO.3-5-781/20 TO 3-5-785/1 AT SHAIRGATE KINGKOTHI UNDER NARAYANAGUDA SECTION | 188806 | MDHMWSSB |
| 118 | LAYING OF 150 MM DIA/100 MM DIA DI WS PIPE LINES WITH INLINE BOOSTER AT H.NO. 14-9-396 AND 14-6-253 AT KEMDASS MUTT AREA UNDER GODE-KI-KHABAR SECTION O&M DIVISION-IV. | 1178556 | MDHMWSSB |
| 119 | "LAYING OF 10"" DIA SWG SEWER LINE FROM H.NO. 11-3-266/16 TO 11-3-266/15/3/1 AT MOHMOODNAGAR UNDER SINIVASANAGAR SECTION SUB DIVISION-II DIVISION-7 MARREDPALLYSECUNDERABAD ASSEMB" | 449318 | MDHMWSSB |
| 120 | FOR LAYING 100 MM DIA DI WATER PIPE LINE AT VENKAT NAGAR TUKARAMGATE FROM HOUSE NO. 10-5-779/135 TO HOUSE NO. 10-5-779/32/4 MAREDPALLY SECUNDERABAD | 459036 | MDHMWSSB |
| 121 | PROVIDING WATER FACILITY AND CONSTRUCTION OF BATHROOMS IN HINDU GRAVE YARD PARISIGUTTA IN VIDYA NAGAR DIVISION OF MUSHEERABAD SEGMENT | 287442 | COMMISSIONER GHMC |
| 122 | LAYING OF CC ROAD AND RAISING OF COMPUND WALL IN HINDU GRAVE YARD PARISIGUTTA IN VIDYA NAGAR DIVISION MUSHEERABAD | 142346 | COMMISSIONER GHMC |
| 123 | CONSTRUCTION OF RCC HALL AND PROVIDING BORE WELL AT HINDU GRAVE YARD PARSIGUTTA OF MUSHEERABAD SEGMENT | 440069 | COMMISSIONER GHMC |
| 124 | CONSTRUCTION OF COMMUITY HALL NEAR SAI BABA TEMPLE AT SHAIKPET DIVISION NO. 10 MCH KHAIRATHABAD SGEMENT | 1703838 | COMMISSIONER GHMC |
| 125 | LAYING OF CC ROAD AT VARIOUS LANES IN VENKAT NAGAR TUKKARAMGATE UNDER MAREDPALLY SEGMENT SECUNDERABAD | 889658 | COMMISSIONER GHMC |
| 126 | CONSTRUCTION OF 1ST FLOOR OF THE DASHAM GOSWAMY MANDAL AT SHAHNIYATGUNJ WARD NO. 14 DIVISION NO. 2 (S.z.) MCH HYDERABAD | 1396882 | COMMISSIONER GHMC |
| 127 | CONSTRUCTION OF BALANCE WORK PERTAINING TO THE CONSTRUCTION OF COMMUNITY HALL AT A-BAND LANE LAXMINAGAR ASIFNAGAR ASSEMBLY SEGMENT | 983812 | COMMISSIONER GHMC |
| 128 | LAYING OF CC ROAD FROM MAIN ROAD LAKDIKAPUL TO THE NEW OFFICE OF AP POLICE OFFICERS ASSOOCIATION BAND LINES LAKDIKAPUL AND POLICE QTRS. | 1000000 | COMMISSIONER GHMC |
| 129 | CONSTRUCTION OF THE COMMUNITY HALL AT LALITHA NAGAR VIDYANAGAR HYDERABAD | 1500000 | COMMISSIONER GHMC |
| 130 | SHIFTING OF 1 NO. 160 KVA DTR ON 11 KV ASIFNAGAR (RAMLEELA GROUNDS) IN SEETHAFALMPET SECTION. | 140233 | APCPDCL |
| 131 | SHIEFING OF 11 KV AND HIGH TENSION WIRES AT VINOBHA COLONY PARSIGUTTA | 228842 | APCPDCL |
| 132 | SHIEFTING OF 100 KVA & 250 KVA DISTRIBUTION TRANSFORMERS AT SRINIVASANAGAR COLONY MAHMOODGUDA IN PARSIGUTTA SECTION P.R. NAGAR. | 172470 | APCPDCL |
| 133 | SHIFTING OF HIGH TENSION WIRE LINE FROM LOC NO. 31 TO 36 OF 33 KV INDUSTRIAL AREA AT VINOBA NAGAR COLONY OF RAMNAGAR AREA IN SECUNDERABAD PALIAMENTARY CONSTITUENCY | 176240 | APCPDCL |
| 134 | SHIFTING OF HIGH TENSION WIRE LINE FROM LOC NO. 31 TO 36 OF 33 KV INDUSTRIAL AREA AT VINOBA NAGAR COLONY OF RAMNAGAR AREA IN SECUNDERABAD PALIAMENTARY CONSTITUENCY | 211383 | APCPDCL |
| 135 | ERECTION OF TWO NEW BOX POLES SHIFTING OF HT/LT LINES PASSING THROUGH THE HOUSES AT MS MAKHTA OPP. RAJABHAVAN IN SAIFABAD DIVISION | 42991 | APCPDCL |
| 136 | SHIFTING OF 2 NOS 3 WAY RMU FROM NEAR HOLLYWOOD FOOT WEAR ABIDS TO ERECTION AT BACK SIDE HOLLYWOOD FOOTWEAR ABIDS IN SAIFABAD DIVISION HYDERABAD | 280402 | APCPDCL |
| 137 | LAYING OF CC ROAD IN IAS COLONY FROM 8-1-398/3/A/48 TO 8-1-398/A/3 UNDER KHAIRATHABAD ASSEMBLY SEGMENT | 499090 | ADMINISTRATORQQSUDAHYD |
| 138 | LAYING OF CC ROAD IN IAS COLONY FROM 8-1-398/3/A/18 TO 8-1-398/A/28 UNDER KHAIRATHABAD ASSEMBLY SEGMENT | 499090 | ADMINISTRATORQQSUDAHYD |
| 139 | LAYING OF CC ROAD IN IAS COLONY FROM 8-1-398/1/39 TO 8-1-398/A/18 UNDER KHAIRATHABAD ASSEMBLY SEGMENT | 499090 | ADMINISTRATORQQSUDAHYD |
| 140 | LAYING OF CC ROAD IN IAS COLONY FROM 8-1-398/D/61 TO 8-1-398/D/65 UNDER KHAIRATHABAD ASSEMBLY SEGMENT | 499090 | ADMINISTRATORQQSUDAHYD |
| 141 | S/5 AESPIRE - 100 (2 GASES) ANAESTHESIA MACHINE WITH ANAESTHESIA VENTILATOR | 550000 | SUPDT. GOVT.GEN.&CHEST HOSPITA |
| 142 | DATEX - 4000 WITH ET CO2 MULTI CHANNEL MONITOR | 300000 | SUPDT. GOVT.GEN.&CHEST HOSPITA |
| 143 | ECG MACHINE WITH PULSE OXMIMETER | 90000 | SUPDT. GOVT.GEN.&CHEST HOSPITA |
| 144 | 1. NERVE STIMULATOR FISHER & PAYKEL MODEL NS 252 | 27000 | SUPDT. GOVT.GEN.&CHEST HOSPITA |
| 145 | PROPOSALS OF CONSTRUCTION OF ADDITIONAL CLASS ROOMS AT GOVERNMENT JUNIOR COLLEGE ALIYA HYDERABAD | 1881347 | EER&BNBD HYD. |
| 146 | CONSTRUCTION OF WAITING HALLS (2 NOS.) AT HINDU SMASANA VATIKA EAST MARREDPALLY DIVISION-II GHMC SEC'BAD | 858338 | COMMISSIONER GHMC |
| 147 | RAISING DRAIN WALLS AT HINDU SMASANA VATIKA EAST MARREDPALLY DISIVON-II GHMC SEC BAD | 907011 | COMMISSIONER GHMC |
| 148 | LAYING OF CC ROAD AT INDU SMASANA VATIKA EAST MARREDPALLY DISIVON-II GHMC SEC BAD | 418586 | COMMISSIONER GHMC |
| 149 | ERECTION OF 33 KV BOX POLES NEAR RENUKA NAGAR (WEST) AT BK GUDA ON 33 KV ERRAGADDA-BEGUMPET SCOH REDDER MASTER PLAN CIRCLE HYDERABAD | 342367 | APCPDCL |
| 150 | CONSTRUCTION OF INTERMEDIATE SEWER MANHOLES AT VARIOUS PLACES AT KESAVANAGAR AND VIJAYAPURI COLONY UNDER TARNAKA DIVISON | 92000 | MDHMWSSB |
| 151 | CONSTRUCTION OF INTERMEDIATE SEWER MANHOLES AT VARIOUS PLACES AT MCH QUARTERS TUKARAMGATE GOVINDAPURAMM AND METTUGUDA UNDER METTUGUDA SECTION OF SD III | 98500 | MDHMWSSB |
| 152 | CONSTRUCTION OF COMMUNITY HALL/AUDITORIUM IN APSWR SCHOOL 9G0 GOWLIDODDI GHACHIBOWLI SERILINGAMPALLY MUNICIPALITY CIRCLE GHMC | 1000000 | COLLECTOR RR DIST |
| 153 | SHIFTING OF 33 KV SCOH LINE NEAR INDIRA NAGAR ROAD NO.2 BANJARA HILLS HYDERABAD | 1438015 | APCPDCL |
| 154 | "REPLACEMENT OF DAMAGED 6"" DIA SWG SEWER PIPELINE WITH 300 MM DIA 200 MM DIA SWG SEWER LINE FROM H.NO. EWS-11-94 TO 1-6-212/65/A-107/150 UNDER MUSHEERABAD SECTION." | 640000 | MDHMWSSB |
| 155 | LAYING OF 300 MM DIA SWG SEWER LINE FROM 1-7-510/A/5/2 TO 1-7-509/7 IN HARI NAGAR UNDER AZAMABAD SECTION | 654865 | MDHMWSSB |
| 156 | LAYING OF DRAINAGE & WATER PIPELINE AT GOVT. QRTS APSW SCHOOL MAHENDRA HILLS | 99568 | EE (SW) HYDERABAD |
| 157 | CC. ROAD AND RAMP TOWARDS ARTIFICIAL LIMB CENTER AT DISTRICT HOSPITAL KING KOTI HYDERABAD | 403325 | M.S. DISTRICT HOSPTIAL KING K |
| 158 | Construction of Compound wall and raising the same to Grave Yard Bakaram near H.No.1-4-880 Bholakpur Division Hyderabad | 417527 | COMMISSIONER GHMC |
| 159 | CONSTRUCTION OF SCHOOL BUILDING (PRIMARY BLOCK) OF SVES HIGH SCHOOL VIDYA NAGAR HYDERABAD | 1150000 | DM HOUSING |
| 160 | REPLACEMENT OF 150MM DIA SWG PIPE LINES TO 200MM DIA PIPE LINES FROM H.NO.1-9-485/16/1/A TO 1-9-271/1 NEW LALITHANAGAR UNDER AZAMABAD SECTION | 276010 | MDHMWSSB |
| 161 | LAYING OF 6MM DIA DI WATER SUPPLY MAIN FROM H.NO.10-5-79/6/T TO 10-5-79 AT TUKARAMGATE UNDER METTUGUDA SECTION OF S.D.III | 391301 | MDHMWSSB |
| 162 | Construction of Bath Rooms in Hindu Grave Yard at Mettuguda Division (Dn.12) Secunderabad Segment | 912974 | COMMISSIONER GHMC |
| 163 | Laying of 100mm thick CC road opp. Jama Masjid Sesha Pahad Shantinagar Division (Dn.12) Secunderabad Segment | 2207560 | COMMISSIONER GHMC |
| 164 | CONSTRUCTION OF BURIAL PLATFORM AND SHED AT PANDU RANGA NAGAR BURIAL GROUND IN WARD NO.27 OF GHMC MOTINAGAR KUKATPALY MUNICIPALITY RR. DISTRICT | 499000 | COLLECTOR RR DIST |
| 165 | LAYING OF 150/100 MM DIA DI WATER PIPE LINE FROM H.NO.10-5-675/1 TO H.NO.10-5-779/45/A H.NO.10-5-779/3 TO H.NO.10-5-779/3/6 AT VENKAT NAGAR TUKARAMGATE UNDER MAREDPALLY SECTION S | 379745 | MDHMWSSB |
| 166 | Purchase of a passenger Auto (Diesel) for transportation of sick students of A.P.S.W.R.S/Jr College for Boys Shaikpet Hyderabad | 127991 | PRINCIPAL APSWRS |
| 167 | LAYING OF 250 MM DIA SWG SEWER LINE FROM 10-2-369 TO 10-2- AND FROM PLOT NO. 154 TO ARUNODYA STORES AT WEST MARREDPALLY UNDER MARREDPALLY SECTION AT SD-II HYDERABAD | 560000 | MDHMWSSB |
| 168 | LAYING OF 200/150MM DIA DI WATER SUPPLY LINE FOR PROVIDING WATER SUPPLY TO DIVYA SAI ENCLAVE UNDER MADHAPUR SECTION SERLINGAMPALLY R.R. DISTIRCT | 999000 | COLLECTOR RR DIST |
| 169 | Purchase of Video Gastroscope Video Colonoscope Video Processor Video Light Sensor & Monitor equipment to Gastroenterology department Gandhi Hospital Secunderabad | 1485000 | SUPDT. GANDHI SECUNDERABAD |
| 170 | Construction of Compound Wal Three Rooms and laying of CC Road to Indira Gandhi Puram Grave yard in ward No. 22 of GHMC Kukatpally Ranga Reddy District. | 3636000 | COLLECTOR RR DIST |
| 171 | Shifting of Distribution Transformer at Gandhi Nagar Police Station in P.R. Nagar Section in Sec'bad Division | 82765 | APCPDCL |
| 172 | Construction of Pedestals for providing Water Tank for the existing Borewell with Motor at H.No.465 Near Community Hall Addagutta Secunderabad | 25000 | EE (SW) HYDERABAD |
| 173 | Extension of LT Supply to to Dhobhighat Shaikpet Hyderabad | 70000 | APCPDCL |
| 174 | Syntax Static Tank at H.No.1-9-9/A/5 Medi Bavi Basthi under Azamabad Section Sub Dn.II Hyderabad | 45000 | MDHMWSSB |
| 175 | Construction works pertaining to extension of Sri Harish Chandra Auditorium Niloufer Hospital Hyderabad | 2551000 | E.E. APHMHIDCDIVN-IIHYD |
| 176 | Providing Chain Linked Fencing around the Muslim Grave Yard near Sri Ramana Theatre at Tilaknagar of Division.V GHMC Hyderabad | 1062744 | COMMISSIONER GHMC |
| 177 | Laying of 200mm dia SWG sewer line at Ahmed Nagar beside Carrom Board Lane under Ramanthapur Section Hyderabad | 100000 | MDHMWSSB |
| 178 | Installation of Static Water Tank with Power Bore Well Connection near Gandhi Statue Opp to Dargha Under Ramanthapur Section Sub Division-I O&M Din.V Hyderabad | 99456 | MDHMWSSB |
| 179 | "Providing of 6 1/2 "" Dia power bore well and fixing of 5HP submersible pump set along with is accessories and providing 2000 ltrs capacity static tank at H.No. 5-6-825 Aghapura" | 196068 | MDHMWSSB |
| 180 | "Providing of 6 1/2 "" Dia power bore well and fixing of 5HP submersible pump set along with is accessories and providing 2000 ltrs capacity static tank and GI pipes at H.No. 5-6-90" | 196068 | MDHMWSSB |
| 181 | "Providing of 6 1/2 "" Dia power bore well and fixing of 5HP submersible pump set along with is accessories and providing 2000 ltrs capacity static tank with GI pipe connection at Ne" | 181379 | MDHMWSSB |
| 182 | Installation of Static water tank at Pochamma temple New Patel Nagar under Ramanthapur Section. | 59198 | MDHMWSSB |
| 183 | Laying of 100mm dia DI water supply line at Bhagwandass lane Premnagar Under Ramanthapur Section. | 100000 | MDHMWSSB |
| 184 | Laying of 200mm dia SWG sewer line at Bhagwandass lane under Ramanthapur Section. | 90136 | MDHMWSSB |
| 185 | Laying of 100mm dia DI water supply line from H.No.2-3-48/1 to 2-3-48/A/1 at Quadribagh and diversion of 100mm dia line at 2-3-764/A 764/1/13 under Shivam Seciton | 140000 | MDHMWSSB |
| 186 | Laying of 11kv cable Wire in place of HT OH line at H.NO.6-3-243 Prem Nagar Khairatabad Section | 153984 | APCPDCL |
| 187 | Laying of 200mm dia SWG sewerage line from H.No.15-5-394 to 15-5-171/174 at Osman Shahi Opp. Tyres Market under Gowliguda Section Sub Dn.No.II O&M Dn.IV Hyderabad | 118000 | MDHMWSSB |
| 188 | "Providing of 6 1/2 "" Dia power bore well and fixing of 5HP submersible pump set along with is accessories and providing 2000 ltrs capacity static tank at H.No. 5-6-825 Aghapura" | 196068 | MDHMWSSB |
| 189 | "Providing of 6 1/2 "" Dia power bore well and fixing of 5HP submersible pump set along with is accessories and providing 2000 ltrs capacity static tank and GI pipes at H.No. 5-6-90" | 196068 | MDHMWSSB |
| 190 | "Providing of 6 1/2 "" Dia power bore well and fixing of 5HP submersible pump set along with is accessories and providing 2000 ltrs capacity static tank with GI pipe connection at Ne" | 181379 | MDHMWSSB |
| 191 | Installation of Static water tank at Pochamma temple New Patel Nagar under Ramanthapur Section. | 59198 | MDHMWSSB |
| 192 | Laying of 100mm dia DI water supply line at Bhagwandass lane Premnagar Under Ramanthapur Section. | 100000 | MDHMWSSB |
| 193 | Laying of 200mm dia SWG sewer line at Bhagwandass lane under Ramanthapur Section. | 90136 | MDHMWSSB |
| 194 | Laying of 100mm dia DI water supply line from H.No.2-3-48/1 to 2-3-48/A/1 at Quadribagh and diversion of 100mm dia line at 2-3-764/A 764/1/13 under Shivam Seciton | 140000 | MDHMWSSB |
| 195 | Laying of 150mm dia DI water supply pipeline from M.I.G.-16 Block-IV upto Plot No.4A & 5A Opp: Telephone Exhcnage Phase-V KPHB Colony R.R. District. | 1000000 | COLLECTOR RR DIST |
| 196 | Providing water supply to Madura Hills Colony by laying 200mm/100mm dia DI water supply distribution lines under Madhapur section sub Dn.No.III Madhapur Hyderabad R.R. District | 1860000 | COLLECTOR RR DIST |
| 197 | Laying of CC road with RMC in the balance portion near Eidgah Chilkalguda Division.XII GHMC Sec'bad | 1106342 | COMMISSIONER GHMC |
| 198 | Providing & fixing of chain link fencing to the boundary wall of Muslim Grave Yard in S.R. Nagar Ward No.7 Divn.NO.9 GHMC Hyderabad. | 959187 | COMMISSIONER GHMC |
| 199 | Laying of 200mm dia SWG sewer pipe line from H.NO.6-1-350 to near Khairatabad Masjid under Red Hills High Level Section Sub Dn.No.III of O&M Div.NO.IV Red Hills Hyderabad. | 535000 | MDHMWSSB |
| 200 | Construction of Addl. Room with Ground Floor I & II floor for construction of Community hall in EWS Quarters Parsigutta Musheerabad Divn.IV GHMC | 971432 | COMMISSIONER GHMC |